Skip to: site navigation
NHS Trust, Derriford Hospital, Plymouth
Firstly all loose slip bricks were removed using rope access techniques. Then a net rig was designed, made and installed with a black netting, 50mm mesh, a 1.8mm twine diameter with a breaking force of 70kg, this was then over laid with debris netting.
Back to gallery
